2009 Nissan-Datsun Cube BaseFACTORY OEM SERVICE PROCEDURE

Component Function Check

  1. PRECONDITIONING

    TESTING CONDITION: 

    • Before performing the following procedure, confirm that battery voltage is more than 12.8 V at idle. 
    • Before performing the following procedure, confirm that all load switches and A/C switch are turned OFF. 

    GO TO 2.

  2. PERFORM COMPONENT FUNCTION CHECK

    With CONSULT-III 

    1. Start engine and let it idle.
    2. Select "BAT CUR SEN" in "DATA MONITOR" mode with CONSULT-III.
    3. Check "BAT CUR SEN" indication for 10 seconds.

      "BAT CUR SEN" should be above 2, 300 mV at least once. 

      Without CONSULT-III 

      1. Start engine and let it idle.
      2. Check the voltage between ECM harness connector and ground.
      TERMINAL VOLTAGE REFERENCE CHART

      ECM Voltage
      Connector + -
      Terminal Terminal
      F8 58 (Battery current sensor signal) 68 Above 2.3 V at least once

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to "DIAGNOSIS PROCEDURE "

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.