2005 Nissan-Datsun Sentra Base, AutomaticFACTORY OEM SERVICE PROCEDURE

ECM Relay

  1. Apply 12V direct current between ECM relay terminals 1 and 2.
  2. Check continuity between relay terminals 3 and 5, 6 and 7.
    Fig 1: Checking Continuity Between ECM Relay Terminals 3 And 5, 6 And 7
    G02450512Courtesy of NISSAN MOTOR CO., U.S.A.
    ECM RELAY TERMINAL CONTINUITY

    Condition Continuity
    12V direct current supply between terminals 1 and 2 Yes
    OFF No
  3. If NG, replace ECM relay.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.