2005 Nissan-Datsun Maxima SLFACTORY OEM SERVICE PROCEDURE

Diagnostic Procedure

  1. CHECK GROUND CONNECTIONS 
    1. Turn ignition switch OFF.
    2. Loosen and retighten four ground screws on the body.

      Refer to GROUND INSPECTION .

      Fig 1: Checking Ground Connections
      G02410346Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG

    • OK: GO TO  2.
    • NG: Repair or replace ground connections.
  2. CHECK THROTTLE CONTROL MOTOR RELAY INPUT SIGNAL CIRCUIT-I 
    1. Check voltage between ECM terminal 3 and ground under the following conditions with CONSULT-II or tester.
      IGNITION SWITCH CONDITION - VOLTAGE

      Ignition switch Voltage
      OFF Approximately 0V
      ON Battery voltage (11 - 14V)
      Fig 2: Checking Voltage Between ECM Terminal 3 & Ground
      G02410347Courtesy of NISSAN MOTOR CO., U.S.A.

      OK or NG

      • OK: GO TO  10.
      • NG: GO TO  3.
  3. CHECK THROTTLE CONTROL MOTOR RELAY INPUT SIGNAL CIRCUIT-II 
    1. Turn ignition switch OFF.
    2. Disconnect ECM harness connector.
    3. Disconnect IPDM E/R harness connector E124.
    4. Check continuity between ECM terminal 3 and IPDM E/R terminal 42. Refer to WIRING DIAGRAM .

      Continuity should exist. 

    5. Also check harness for short to ground and short to power.

    OK or NG

    • OK: GO TO  5.
    • NG: GO TO  4.
  4. DETECT MALFUNCTIONING PART 

    Check the following.

    • Harness connectors E131, M92
    • Harness connectors M70, F58
    • Harness for open or short between ECM and IPDM E/R
    • : Repair open circuit or short to ground or short to power in harness or connectors.
  5. CHECK THROTTLE CONTROL MOTOR RELAY POWER SUPPLY CIRCUIT-I 
    1. Reconnect all harness connectors disconnected.
    2. Check voltage between ECM terminal 104 and ground with CONSULT-II or tester.

      Voltage: Battery voltage 

    OK or NG

    • OK: GO TO  9.
    • NG: GO TO  6.
      Fig 3: Checking Voltage Between ECM Terminal 104 & Ground
      G02410348Courtesy of NISSAN MOTOR CO., U.S.A.
  6. CHECK THROTTLE CONTROL MOTOR RELAY POWER SUPPLY CIRCUIT-II 
    1. Disconnect ECM harness connector.
    2. Disconnect IPDM E/R harness connector E121.
    3. Check continuity between ECM terminal 104 and IPDM E/R terminal 47. Refer to WIRING DIAGRAM .

      Continuity should exist. 

    4. Also check harness for short to ground and short to power.

    OK or NG

    • OK: GO TO  8.
    • NG: GO TO  7.
  7. DETECT MALFUNCTIONING PART 

    Check the following.

    • Harness connectors E131, M92
    • Harness for open or short between ECM and IPDM E/R
    • : Repair open circuit or short to ground or short to power in harness or connectors.
  8. CHECK FUSE 
    1. Disconnect 15A fuse.
    2. Check 15A fuse for blown.

    OK or NG

    • OK: GO TO  9.
    • NG: Replace 15A fuse.
  9. CHECK INTERMITTENT INCIDENT 

    Refer to TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT .

    OK or NG

  10. CHECK THROTTLE CONTROL MOTOR OUTPUT SIGNAL CIRCUIT FOR OPEN OR SHORT 
    1. Turn ignition switch OFF.
    2. Disconnect electric throttle control actuator harness connector.
    3. Disconnect ECM harness connector.
    4. Check harness continuity between the following terminals. Refer to WIRING DIAGRAM .
      Fig 4: Electric Throttle Control Actuator Terminals Continuity Chart
      G02410349Courtesy of NISSAN MOTOR CO., U.S.A.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.