2003 Nissan-Datsun Sentra SE-R, AutomaticFACTORY OEM SERVICE PROCEDURE

Fuse Check

WARNING: This page is about a different car, the 2003 Nissan Murano. However, it is still accessible from the selected car via links, so may be relevant.
  1. FUSE INSPECTION 

    Check 50A fusible link [letter F located in the fuse block (J/B)].

    OK or NG 

    1. OK: GO TO 2
    2. NG: If fuse is blown, be sure to eliminate cause of malfunction before installing new fuse, refer to POWER SUPPLY ROUTING CIRCUIT .

  2. CHECK POWER SUPPLY CIRCUIT 
    1. Turn ignition switch OFF.
    2. Disconnect BCM connector.
    3. Check voltage between BCM connector E118 terminal 7 and ground.
      Fig 1: Checking Voltage Between BCM And Ground
      G01198364Courtesy of NISSAN MOTOR CO., U.S.A.

      7 (W/B) - Ground: Battery voltage should exist. 

    OK or NG 

    1. OK: GO TO 3
    2. NG: Repair or replace BCM power supply circuit.

  3. CHECK GROUND CIRCUIT 

    Check continuity between BCM connector E118 terminal 8 (B) and ground.

    Fig 2: Checking Continuity Between BCM And Ground
    G01198365Courtesy of NISSAN MOTOR CO., U.S.A.

    8 (B) - Ground: Continuity should exist. 

    OK or NG 

    1. OK: BCM power supply and ground circuit is OK.
    2. NG: Repair or replace BCM ground circuit.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.