2003 Nissan-Datsun Sentra SE-R, AutomaticFACTORY OEM SERVICE PROCEDURE

2. Check FPCM Power Supply Circuit

WARNING: This page is about a different car, the 2004 Infiniti M45. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect fuel pump control module (FPCM) harness connector.
    Fig 1: Identifying Fuel Pump Control Module (FPCM)
    G00796391Courtesy of NISSAN MOTOR CO., U.S.A.
  2. Turn ignition switch ON.
  3. Check voltage between FPCM terminal 2 and ground with CONSULT-II or tester.
    Fig 2: Checking Voltage Between FPCM Terminal 2 & Ground
    G00796392Courtesy of NISSAN MOTOR CO., U.S.A.

    Voltage: Battery voltage 

OK or NG 

  1. OK: GO TO 4. CHECK FPCM GROUND CIRCUIT-I FOR OPEN AND SHORT .
  2. NG: GO TO 3.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.