2003 Nissan-Datsun Sentra SE-R, AutomaticFACTORY OEM SERVICE PROCEDURE

Vehicle Speed Signal Check for NAVI Control Unit

WARNING: This page is about a different car, the 2004 Nissan Murano. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK VEHICLE SPEED OPERATION 

    Does speedometer is operated normally?

    Yes or No

    1. YES: GO TO 2.
    2. NO: Check combination meter trouble diagnosis. Refer to "DIAGNOSIS FLOW ".
  2. CHECK HARNESS 
    1. Turn ignition switch OFF.
    2. Disconnect NAVI control unit connector, unified meter and A/C amp. connector, combination meter connector, display control unit connector and audio unit connector.
    3. Check continuity between NAVI control unit harness connector M63 terminal 28 (V/W) and unified meter and A/C amp. harness connector M50 terminal 26 (V/W).

      Continuity should exist. 

    4. Check continuity between NAVI control unit harness connector M63 terminal 28 (V/W) and ground.

      Continuity should not exist. 

      Fig 1: Checking Continuity Between NAVI Control Unit Harness Connector And Ground
      G03492561Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG

    1. OK: GO TO 3.
    2. NG: Repair harness.
  3. CHECK1: VEHICLE SPEED SIGNAL 
    1. Connect NAVI control unit connector.
    2. Turn ignition switch ON.
    3. Check voltage between NAVI control unit harness connector M63 terminal 28 (V/W) and ground.

      Approx. 5V 

      Fig 2: Checking Voltage Between NAVI Control Unit Harness Connector And Ground
      G03492562Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG

    1. OK: GO TO 4.
    2. NG: Replace NAVI control unit.
  4. CHECK2: VEHICLE SPEED SIGNAL 
    1. Turn ignition switch OFF
    2. Connect unified meter and A/C amp. connector, combination meter connector, display control unit connector and audio unit connector.
    3. Drive vehicle at a constant speed.
    4. Check signal between NAVI control unit harness connector M63 terminal 28 (V/W) and ground with CONSULT-II or oscilloscope.

      28 (V/W) - Ground: Refer to " TERMINALS AND REFERENCE VALUE FOR NAVI CONTROL UNIT   ". 

      Fig 3: Checking Signal Between NAVI Control Unit Harness Connector And Ground
      G03492563Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG

    1. OK: Replace NAVI control unit.
    2. NG: Replace unified meter and A/C amp. Refer to "REMOVAL AND INSTALLATION OF UNIFIED METER AND A/C AMP ".
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.