2002 Nissan-Datsun Sentra SE-R, AutomaticFACTORY OEM SERVICE PROCEDURE

IPDM E/R Operation Check

WARNING: This page is about a different car, the 2008 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK IPDM E/R INPUT VOLTAGE 

    Check voltage between IPDM E/R connector E121 terminal 51 and ground.

    TERMINALS VOLTAGE CHART

    Connector Terminal Voltage (V) (Approx.)
    ( + ) ( - )
    E121 51 Ground Battery voltage

    OK or NG 

    OK: Replace IPDM E/R. Refer to "REMOVAL AND INSTALLATION OF IPDM E/R ".

    NG: GO TO 2.

    Fig 1: Checking Voltage Between IPDM E/R Connector E121 Terminal 51 And Ground
    G04877120Courtesy of NISSAN MOTOR CO., U.S.A.
  2. CHECK IPDM E/R INPUT VOLTAGE 
    1. Turn ignition switch OFF.
    2. Disconnect IPDM E/R and horn relay.
    3. Check continuity between IPDM E/R connector E121 terminal 51 and horn relay connector H-1 terminal 1.

      51 - 1 : Continuity should exist. 

    4. Check continuity between IPDM E/R connector E121 terminal 51 and ground.

      51 - Ground : Continuity should not exist. 

    OK or NG 

    OK: Further inspection is necessary. Refer to "SYMPTOM CHART ".

    NG: Repair or replace harness.

    Fig 2: Checking Continuity Between IPDM E/R Connector E121 Terminal 51 And Horn Relay Connector H-1 Terminal 1, And Between Connector E121 Terminal 51 And Ground
    G04907083Courtesy of NISSAN MOTOR CO., U.S.A.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.