1983 Nissan-Datsun Sentra Base, 2D Hatchback, AutomaticFACTORY OEM SERVICE PROCEDURE

Glow Plug Control Unit

  1. To test pre-glow operation, connect test lamp to Blue wire of control unit (harness connector plugged in). Turn ignition on and measure amount of time test lamp is lighted. See Pre-Glow Test Specifications table.
    PRE-GLOW TEST SPECIFICATIONS

    Coolant Temp. °F (°C) Time in Seconds Terminal Voltage
    Below 122 (50) 12 8
    Below 122 (50) 6 10.5
    Above 122 (50) 0 0
  2. Connect test lamp to Black/White wire of control unit. Measure amount of time that test lamp is lighted when ignition switch is turned from "START" to "ON". See After-Glow Test Specifications table. Test lamp will be on continuously with switch in "START" position.
    AFTER-GLOW TEST SPECIFICATIONS

    Coolant Temperature °F (°C) Time in Seconds
    Below -13 (-25) 31
    68 (20) 11
    104 (40) 9
    122 (50) 0
  3. Test lamp will turn off during after-glow operation when glow plug voltage reaches 7 volts. Replace glow plug control unit if defective.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.