2007 Mitsubishi Raider SEFACTORY OEM SERVICE PROCEDURE

Engine Electrical: Battery: Installation

Fig 1: Identifying Battery Thermal Guard, Battery, Hold Down And Bolt
G04854905Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  1. Clean and inspect the battery case, terminal posts and battery cable clamps, (Refer to ENGINE ELECTRICAL/BATTERY SYSTEM/CLEANINGΒ ).
  2. Position the battery (2) into the vehicle. Ensure that the battery positive and negative terminal posts are correctly positioned. The battery cable terminal clamps must reach the correct battery terminal post without stretching the cables.
  3. Install the thermal guard (1) and slide battery toward fender.
  4. Install the battery hold down (4) and bolt (3) onto the battery. Tighten the bolt to 4.5 N.m (40 in. lbs.).
    Fig 2: Identifying Battery System Components
    G04854895Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.