1990 Mitsubishi SigmaFACTORY OEM SERVICE PROCEDURE

Ignition Switch Input Circuit

A condition for operation of this system is the sending of HIGH-level signals to the electronic control unit when the ignition switch is switched to the ACC/ON position. See Fig 1 .

Fig 1: Testing ETACS Control Unit Ignition Switch Input Circuit
G00170524Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.