2017 Mini Cooper Base, 2D Convertible, Automatic TransFACTORY OEM SERVICE PROCEDURE

Functional description

At the blower output stage, the control unit of the integrated automatic heating/air-conditioning system (IHKA control unit) specifies the nominal voltage for the blower motor. The nominal voltage is output by the IHKA control unit as a signal on the LIN bus. The activation of the blower motor via the blower output stage takes place depending on this control signal.

G11650642Courtesy of BMW OF NORTH AMERICA, INC.
Index Explanation
1 Blower motor
2 Fan wheel
3 two-pin plug connection
4 Blower of the heating and air conditioning system
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.