1993 Mercedes Benz 600SECFACTORY OEM SERVICE PROCEDURE

Preparation For Test (Section 22)

  1. Turn ignition OFF.
  2. Remove diagnostic module (N59).
  3. Connect socket box with contact module 3 and contact box. See Fig 1 .
  4. NOTE: The following step only pertains to test steps 1.2-1.3 and 2.1-2.2.
  5. With ignition OFF, remove base module (N16/1).Connect socket box with contact module 1 and contact box.
Fig 1: Connecting Socket Box To Control Module
G00224194Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.