1993 Mercedes Benz 400EFACTORY OEM SERVICE PROCEDURE

Test Preparation For DTC Readout

  1. Connect impulse counter scan tool and adapter or HHT to data link connector (X11/4).
  2. Connect Yellow wire from impulse counter scan tool as follows:

    1. Socket 8

      Base Module - BM (N16/1)
    2. Socket 6

      ABS or ASR control module (N30 or N30/1) or ASR/SPS control module (N47-1) or ESP/SPS control module (N47-5)
    3. Socket 12

      SPS control module (N49/1)
    4. Socket 11

      ADS control module (N51)
    5. Socket 4

      EDS control module (N39), LH-SFI or Right LH-SFI control module (N3/1 or N3/3), ME-SFI right engine control module (N3/10 or N3/12)
    6. Socket 5

      Left LH-SFI control module (N3/2) or ME-SFI left engine control module (N3/11)
  3. Turn ignition ON.
  4. Read DTC memory (as applicable) for appropriately connected BM, ASR, ASR/SPS, ESP/SPS. ME-SFI, ADS, LH-SFI control modules.
Fig 1: Identifying Special Tools
G00222905Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.