2021 Mazda 3 BaseFACTORY OEM SERVICE PROCEDURE

EPS Control Module Inspection

  1. Attach the tester lead to the underside of the EPS control module connector and inspect the voltage according to the terminal voltage table (reference).

Terminal Voltage Table (Reference)Β 

G13558929Courtesy of MACK TRUCKS, INC.

-: Not applicable

VOLTAGE SPECIFICATION

Terminal Signal name Connected to Measured item Measured terminal (measurement condition) Voltage (V) Inspection item(s)
1A Battery power supply Battery Voltage Under any condition B+
  • Wiring harness (1A-battery)
  • Fuse (F19 60A)
1B Ground Ground point Voltage Under any condition Approx. 0
  • Ground point
  • Wiring harness (1B-ground point)
2A CAN_L - Perform DTC inspection -
2B - - - - - -
2C CAN_H - Perform DTC inspection -
2D - - - - - -
2E - - - - - -
2F Ignition power supply IG1 relay No. 2 Voltage Ignition ON (engine off or on) B+
  • Wiring harness (2F-IG1 relay No. 2-battery)
  • Fuse (F48 7.5A)
Ignition off 1 or less
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.