2013 Mazda MX-5 Miata Grand Touring, Automatic TransFACTORY OEM SERVICE PROCEDURE

Circuit Open/Short Inspection

  1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION ).
  2. Inspect the following wiring harness for open or short circuit (continuity Inspection).
    Fig 1: Identifying CPP Switch Wiring Harness-Side Connector Terminals
    G06151059Courtesy of MAZDA MOTORS CORP.

Open circuit 

  • If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
    • CPP switch terminal B and PCM terminal 1D
    • CPP switch terminal D and body ground

Short circuit 

  • If there is continuity, there is a short circuit. Repair or replace the wiring harness.
    • CPP switch terminal B and body ground
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.