2001 Mazda MPV ESFACTORY OEM SERVICE PROCEDURE

Assembly Procedure

  1. Apply ATF to the seal rings.
  2. Install the piston and N-D accumulator spring.
  3. Apply ATF to the seal rings.
  4. Install the N-R accumulator springs and piston.
    Fig 1: Installing N-R Accumulator Springs & Piston
    G03186233
  5. Install the N-R accumulator gasket and plate.
  6. Tighten the plate bolt.

    Tightening Torque 

    1. 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf} 

  7. Apply ATF to the seal rings.
  8. Install the piston and 1-2 accumulator springs.
    Fig 2: Installing Piston & 1-2 Accumulator Springs
    G03186234
  9. Install the 1-2 accumulator gasket and plate.
  10. Tighten the plate bolt.

    Tightening Torque 

    1. 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf} 

  11. Install the bypass valve spring, bypass valve, stop plug, and stop pin.
  12. Install the cut back spring, cut back valve B, cut back valve A, stop plug, and stop pin.
  13. Install the 3-2 timing spring, 3-2 timing valve, stop plug, and stop pin.
  14. Install the pressure modifier accumulator valve, pressure modifier accumulator spring, and spring retainer.
Fig 3: Installing Pressure Modifier Accumulator Valve, Pressure Modifier Accumulator Spring & Spring Retainer
G03186235
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.