Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
Assembly Procedure
- Install The Oil Strainer And Rubber Balls Into The Main Control Valve Body.
- Install the oil strainer and rubber ball into the rear control valve body.
- Set the new main/rear front gasket, rear separator plate, and new main/rear rear gasket on the rear control valve body. Refer to the figure to distinguish the two gaskets.
- Set the rear control valve body onto the main control valve body.
- Install and hand-tighten the bolts shown in the figure. Each type of bolt has a different letter on its head. Match the bolt letter with the letter stamped next to its installation hole on the valve body.
- Install the oil strainers and rubber balls into the main control valve body.
- Install the oil strainer and rubber balls into the premain control valve body.
- Install the jet orifice and nuts to the main separator plate.
Tightening Torque
- 1.7-2.2 N.m {17-23 kgf.cm, 15-19 in.lbf}
- Set a new premain/main rear gasket, main separator plate, and new premain/main front gasket on the premain control valve body. Refer to the figure to distinguish the two gaskets.
- Set the premain control valve body onto the main control valve body.
- Install and hand-tighten the bolts indicated by the arrows. Each type of bolt has a different letter on its head. Match the bolt letter with the letter stamped next to its installation hole on the valve body.
- Install the rubber ball into the premain control valve body.
- Install the rubber ball into the front control valve body.
- Set a new front/premain rear gasket, premain separator plate, and new front/premain front gasket on the front control valve body. Refer to the figure to distinguish the two gaskets.
- Set the front control valve body onto the premain control valve body.
- Install and hand-tighten the bolts indicated by the arrows. Each type of bolt has a different letter on its head. Match the bolt letter with the letter stamped next to its installation hole on the valve body.
- Install four control valve body bolts as shown for alignment.
- Tighten the mounting bolts.
- Tighten the front control valve body.
Tightening Torque:
- 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf}
- Tighten the rear control valve body.
Tightening Torque
- 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf}
- Tighten the front control valve body.
- Apply ATF to new O-rings and install them onto the solenoid valve.
- Install the solenoid valve.
Tightening Torque
- 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf}
- Apply ATF to new O-ring and install them onto the oil pipe component.
- Install the oil pipe component.
Tightening Torque
- 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf}
- Install the oil baffle.
Tightening Torque
- 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf}
- Install the TFT sensor.
Tightening Torque
- 6.5-7.8 N.m {66-80 kgf.cm, 58-69 in.lbf}
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- • You smell fuel, burning insulation, or see smoke.
- • Brakes feel soft, pull hard to one side, or make grinding noises.
- • The engine overheats, stalls repeatedly, or misfires under load.
- • You are missing required tools, torque specs, or safe lifting equipment.
- • You are not confident in the next step or safety outcome.
Rather have a pro handle this?
A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.
No obligation. See pricing before you book.
