2000 Mazda MPV DX V6-2.5L DOHCFACTORY OEM SERVICE PROCEDURE

Cylinder Head Assembly

Cylinder Head Sequences Removal RH Cylinder Head
LH Cylinder Head
Installation RH Cylinder Head
LH Cylinder Head
Tightening Torque First Pass Tighten to 37-43
Second Pass Tighten 85-95 Degrees
Third Pass Loosen 360 Degrees
Fourth Pass Tighten to 37-43
Fifth Pass Tighten 85-95 Degrees
Sixth Pass Tighten 85-95 Degrees
Camshaft Bearing Thrust Cap Sequence Removal RH Cylinder Head
Remove the camshaft bearing thrust caps Nos. 1R and 5R first. Do not loosen any of the other bolts until the thrust caps are removed, or damage to the thrust caps may occur.
LH Cylinder Head
Remove the camshaft bearing thrust caps Nos. 1L and 5L first. Do not loosen any of the other bolts until the thrust caps are removed, or damage to the thrust caps may occur.
Camshaft Bearing Cap Sequence Removal RH Cylinder Head
LH Cylinder Head
Camshaft Bearing Cap (All) Installation RH Cylinder Head
LH Cylinder Head
Tightening Torque 8-12
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.