1993 Mazda 929FACTORY OEM SERVICE PROCEDURE

Except Navajo

  1. On B2200 PFI, B2600i, and MPV, connect jumper wire between terminals of Yellow 2-pin connector. See FUEL PUMP TEST CONNECTOR LOCATIONΒ  table.
  2. On all others, connect jumper wire between GND and F/P terminals of data link connector. See Figure . On all models, turn ignition on for about 10 seconds and then off. Disconnect jumper wire.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.