1993 Mazda 626 ES, AutomaticFACTORY OEM SERVICE PROCEDURE

Check For VBAT To ICM

Turn key off and disconnect PCM. Set DVOM to 20-volt scale. Turn ignition on. Measure voltage between breakout box pins No. (+) J51 (VBAT E) and (-) J7 (BAT negative). See Figure . If voltage is greater than 10.5 volts, go to CHECK FOR GROUND OPEN TO ICM. If voltage is 10.5 volts or less, repair open or short in circuit from ignition switch.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.