1990 Mazda 929 BaseFACTORY OEM SERVICE PROCEDURE

Fuel System: Turbocharger: Installation

To install, reverse removal procedure. Replace gasket between turbocharger and exhaust manifold. Before installation, add 25 cc of clean engine oil to oil passage of turbocharger. See TORQUE SPECIFICATIONSΒ  table.



To install, reverse removal procedure. Replace gasket between turbocharger and exhaust manifold. Before installation, add 25 cc of clean engine oil to oil passage of turbocharger. See TORQUE SPECIFICATIONSΒ  table.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.