Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
1985 Mazda GLC L4-1490cc 1.5LFACTORY OEM SERVICE PROCEDURE
Disassembly and Assembly
Fig. 1 Disassembled view of breakerless type distributor.:
Distributor, Disassemble
1. Remove distributor cap and rotor.
2. Remove retractor to shaft retaining screw, then the retractor, Fig. 1.
3. Remove pickup coil to plate attaching screw, then the pickup coil.
4. Disconnect vacuum advance link from plate, then remove vacuum advance unit to distributor housing attaching screws. Remove vacuum advance unit from distributor.
5. Remove breaker plate assembly retaining screw, then the breaker plate assembly.
6. Remove cam, then the governor assembly.
7. Remove distributor shaft retaining clip, then remove distributor shaft through top of distributor housing.
Distributor, Assemble
Reverse disassembly procedure to assemble. When installing distributor, make sure marks on distributor housing and distributor mounting align as required.
Factory Service Tools
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- β’ You smell fuel, burning insulation, or see smoke.
- β’ Brakes feel soft, pull hard to one side, or make grinding noises.
- β’ The engine overheats, stalls repeatedly, or misfires under load.
- β’ You are missing required tools, torque specs, or safe lifting equipment.
- β’ You are not confident in the next step or safety outcome.
