1982 Mazda B2000 BaseFACTORY OEM SERVICE PROCEDURE

MITSUBISHI Alternators: Overhaul: Disassembly

  1. After removing through bolts, insert screwdriver between front housing and stator to separate housing halves.
  2. Hold the rotor in a soft jawed vice. Remove pulley nut, pulley, fan, and spacer. Remove rotor drive end housing by lightly tapping end housing with a soft mallet.
    CAUTION: To prevent damage to diodes, DO NOT overheat when unsoldering.
  3. To separate stator from diode end housing, unsolder three negative diode leads and connections between diodes. Hold the stator lead with a long nosed plier to prevent rectifier from overheating.
  4. Remove the condenser from the "B" terminal. Unsolder the "L" and "B" terminal form the rectifier assembly. Lift out rectifier assembly and brush holder.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.