2000 Lincoln LS V8-3.9L VIN AFACTORY OEM SERVICE PROCEDURE

Main Relay (Computer/Fuel System): Testing and Inspection

INTRODUCTION

Component testing procedures are provided to determine whether a component is good or bad.

Factory service manual diagram





Testing information for each component includes a schematic with component terminal locations and step-by-step test procedures. Component terminals are identified by letters or numbers that may be marked on the component or call out if there is no mark on the component.




Factory service manual diagram





Factory service manual diagram





Factory service manual diagram





The component connector MUST BE REMOVED before testing. To test a single circuit within the component, select that circuit under the column TO TEST. If you wish to test the complete component, perform all tests.



COMPONENT TESTING PROCEDURE (Voltage Applied)

Disconnect the ohmmeter; connect pins 30 and 85 to 12 V DC power and pin 86 to ground. Measure voltage between pin 87 and pin 86. If the voltage is 12 V, continue with the test. If not, replace the relay. Disconnect power from pin 85 and measure voltage between pin 87A and pin 86. If the voltage is 12 V, the relay is okay. If not, replace the relay.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.