Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
Inspection Procedure
- INSPECT FUSE (IGN, IG2 MAIN, IG2)Â
- Remove the IGN fuse from the engine room No. 2 relay block.
- Remove the IG2 MAIN fuse from the engine room No. 1 relay block.
- Remove the IG2 fuse from the passenger side junction block.
- Measure the resistance of the fuses.
Standard resistance: Below 1 ΩÂ
NG: REPLACE FUSEÂ
OK: Go to Next StepÂ
- INSPECT BATTERYÂ
- Check the battery voltage.
Standard voltage: 11 to 14 VÂ
ResultÂ
RESULT CHARTResult Proceed to Battery voltage is OK (when using Techstream) A Battery voltage is OK (when not using Techstream) B Battery voltage is abnormal C
B: Go to step  4
C: RECHARGE OR REPLACE BATTERYÂ
A: Go to Next StepÂ
- Check the battery voltage.
- READ VALUE OF TECSHTREAM (IG VOLTAGE)Â
- Check the Data List for proper functioning of the IG voltage.
ABS/VSC/TRACÂ
DIAGNOSTIC NOTE CHARTTester Display Measurement Item / Range Normal Condition Diagnostic Note ECU IG Power Voltage ECU power supply voltage / LOW/NORMAL/HIGH LOW: Below 10 V
NORMAL: 10 to 14 V
HIGH: 14 V or more- ResultÂ
RESULT CHARTResult Proceed to Display is not NORMAL A Display is NORMAL B
B: REPLACE SKID CONTROL ECUÂ
A: Go to Next StepÂ
- Check the Data List for proper functioning of the IG voltage.
- INSPECT IGNITION RELAY NO. 2Â
- Remove the IG2 relay from the engine room No. 1 relay block.
- Measure the resistance of the relay.
Standard resistanceÂ
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Condition Specified Condition 3-5 10 kΩ or higher 3-5 Below 1 Ω (when battery voltage is applied to terminals 1 and 2)
NG: REPLACE IGNITION RELAY NO. 2Â
OK: Go to Next StepÂ
- CHECK WIRE HARNESS (SKID CONTROL ECU - BATTERY AND BODY GROUND)Â
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Disconnect the S5, S6 and S8 ECU connectors.
- Turn the ignition switch ON.
- Measure the voltage of the wire harness side connectors.
Standard voltageÂ
TESTER CONNECTION SPECIFIED CONDITION VOLTAGE CHARTTester Connection Specified Condition S6-6 (IG2) - S5-16 (GND4) 10 to 14 V S6-6 (IG2) - S5-22 (GND3) 10 to 14 V S6-6 (IG2) - S8-6 (GND2) 10 to 14 V S6-6 (IG2) - S8-31 (GND1) 10 to 14 V S6-6 (IG2) - Body ground 10 to 14 V - Measure the resistance of the wire harness side connectors.
Standard resistanceÂ
TESTER CONNECTION SPECIFIED CONDITION RESISTANCE CHARTTester Connection Specified Condition S5-16 (GND4) - Body ground Below 1 Ω S5-22 (GND3) - Body ground Below 1 Ω S8-6 (GND2) - Body ground Below 1 Ω S8-31 (GND1) - Body ground Below 1 Ω
NG: REPAIR OR REPLACE HARNESS AND CONNECTORÂ
OK: REPLACE SKID CONTROL ECUÂ
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- • You smell fuel, burning insulation, or see smoke.
- • Brakes feel soft, pull hard to one side, or make grinding noises.
- • The engine overheats, stalls repeatedly, or misfires under load.
- • You are missing required tools, torque specs, or safe lifting equipment.
- • You are not confident in the next step or safety outcome.
