2008 Lexus LS 460LFACTORY OEM SERVICE PROCEDURE

Inspection Procedure

  1. CHECK TCM (POWER SOURCE, BODY GROUND) 
    1. Disconnect the A12 and E5 TCM connectors.
    2. Turn the engine switch on (IG).
    3. Measure the voltage of the wire harness side connectors.

      Standard Voltage 

      VOLTAGE SPECIFICATION

      Tester Connection Switch Condition Specified Condition
      A12-6 (+B) - E5-7 (E1) Engine switch on (IG) 11 to 14 V
    4. Turn the engine switch off.
    5. Measure the resistance of the wire harness side connector.

      Standard Resistance 

      RESISTANCE REFERENCE

      Tester Connection Condition Specified Condition
      ES-7 (E1) - Body ground Always Below 1 Ω
      Fig 1: Identifying A12 And E5 TCM Connector Terminals
      G04948378Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG: CHECK HARNESS AND CONNECTOR (TCM EFI MAIN NO. 2 RELAY, BODY GROUND) 

    OK: GO TO ECM POWER SOURCE CIRCUIT (ENGINE CONTROL SYSTEM / SFI SYSTEM)  (See ECM POWER SOURCE CIRCUIT )

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.