2008 Lexus IS 350FACTORY OEM SERVICE PROCEDURE

Engine Unit: Reassembly

WARNING: This page is about a different car, the 2008 Lexus IS F. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL OIL DRAIN PIPE SUB-ASSEMBLY 
    1. Apply a light coat of engine oil to a new O-ring.
    2. Install the new O-ring to the oil drain pipe sub-assembly
    3. Install the oil drain pipe sub-assembly with the bolt.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

    Fig 1: Locating Oil Drain Pipe Bolt
    G05151290Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL ENGINE REAR OIL SEAL RETAINER 
    1. Apply seal packing in a continuous line as shown in the illustration.

      Seal packing: 

      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent 

      Seal diameter: 

      2.0 to 3.0 mm (0.0787 to 0.118 in.) 

      Application position from inside edge of retainer: 

      3.5 mm (0.138 in.) 

      Fig 2: Identifying Seal Packing Applying Area
      G04943648Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.