2008 Lexus GS 460FACTORY OEM SERVICE PROCEDURE

Inspection Procedure

  1. CHECK HARNESS AND CONNECTOR (TCM - BODY GROUND) 
    1. Disconnect the TCM connectors.
    2. Turn the engine switch off.
    3. Measure the resistance of the wire harness side connector.

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Condition Specified Condition
      A54-2 (E1) - Body ground Always Below 1 Ω

    NG : REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Fig 1: Identifying Terminals Of A54 TCM Connector
    G05806322Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    OK : Go to next step 

  2. CHECK TCM (BATTERY - TCM) 
    1. Disconnect the TCM connectors.
    2. Turn the engine switch on (IG).
    3. Measure the voltage of the wire harness side connectors.

      Standard voltage 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Switch Condition Specified Condition
      A54-5 (+B) - Body ground Engine switch on (IG) 11 to 14 V

    NG : REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Fig 2: Identifying Terminals Of A54 TCM Connector
    G05806323Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    OK : GO TO ECM POWER SOURCE CIRCUIT (ENGINE CONTROL SYSTEM / SFI SYSTEM)  (See COMPONENTS )

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.