2007 Lexus SC 430 V8-4.3L (3UZ-FE)FACTORY OEM SERVICE PROCEDURE

Intake Manifold

INTAKE MANIFOLD

Factory service manual diagram




Install the intake manifold assembly with the 6 bolts and 4 nuts.
Torque 18 N*m (184 kgf*cm, 13 ft.*lbf)

THROTTLE BODY
Install a new gasket and the throttle body with the 2 bolts and 2 nuts.
Torque 18 N*m (184 kgf*cm, 13 ft.*lbf)
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.