Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
2002 Lexus ES 300FACTORY OEM SERVICE PROCEDURE
Fuel Injector ASSY: Replacement
- Work for preventing gasoline from spilling out. See step 2.
- Drain coolant. See REPLACEMENT .
- Remove v-bank cover sub-assy.
- Remove battery.
- Remove air cleaner assembly with hose (See REMOVAL & INSTALLATION & DISASSEMBLY & REASSEMBLY ).
- Remove front suspension upper brace center (w/front suspension brace upper center).
- Remove intake air surge tank.
See page VALVE CLEARANCE .
- Separate fuel pipe sub-assy No. 1
- Remove the pulsation damper and 2 gaskets.
- Remove the bolt and 2 gaskets.
- Remove the bolt and disconnect the fuel pipe sub-assembly No. 1 from the intake manifold.
- Remove fuel injector assy
- Disconnect the injector connectors.
- Remove the 2 bolts and fuel delivery pipe, while pulling out both ends of the fuel delivery pipe equally.
- While turning the injector clockwise and counterclockwise, pull out the injector from the delivery pipe.
- Install fuel injector assy.
- Apply a light coat of gasoline to a new O-ring and install them to each injectors.
- While turning the injector clockwise and counterclockwise, install it to the delivery pipe.
- Check that the injectors rotate smoothly.NOTE: If injectors do not rotate smoothly, the probable cause is incorrect installation of the O-rings. Replace new o-rings.
- Install the delivery pipe with the injectors.
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
NOTE:- Be careful not to drop the injectors when installing the delivery pipe.
- Check that the injectors rotate smoothly after installing the delivery pipe.
- Install fuel pipe sub-assy No. 1
- Install the fuel pipe No. 1 with the 2 new pulsation damper gaskets and the pulsation damper.
Torque: 33 N.m (336 kgf.cm, 24 ft.lbf)
- Install the delivery pipe with 2 new fuel pipe No. 1 gaskets and a bolt to the fuel pipe No. 1.
Torque: 33 N.m (336 kgf.cm, 24 ft.lbf)
- Install the fuel pipe No. 1 to the intake manifold with a bolt.
Torque: 20 N.m (199 kgf.cm, 14 ft.lbf)
- Install the fuel pipe No. 1 with the 2 new pulsation damper gaskets and the pulsation damper.
- Install intake air surge tank (See VALVE CLEARANCE ).
- Install front suspension upper brace center (w/front suspension brace upper center).
Torque: 80 N.m (816 kgf.cm, 59 ft.lbf)
- Install air cleaner assembly with hose. See REMOVAL & INSTALLATION & DISASSEMBLY & REASSEMBLY .
- Install V-bank cover sub-assy.
- Add coolant. See COOLING FAN SYSTEM .
- Check engine coolant leak. See REPLACEMENT .
- Inspect fuel leak.
Factory Service Tools
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- • You smell fuel, burning insulation, or see smoke.
- • Brakes feel soft, pull hard to one side, or make grinding noises.
- • The engine overheats, stalls repeatedly, or misfires under load.
- • You are missing required tools, torque specs, or safe lifting equipment.
- • You are not confident in the next step or safety outcome.
