2000 Lexus SC 400FACTORY OEM SERVICE PROCEDURE

Power Window Motor Circuit

Disconnect power window motor harness connector. Using DVOM, measure voltage between ground and appropriate terminals of passenger's switch. See Fig 1. Ensure voltage is as specified. See POWER WINDOW MOTOR CIRCUIT SPECIFICATIONSΒ  table. If voltage is not as specified, repair circuits as necessary. See WIRING DIAGRAMSΒ .

POWER WINDOW MOTOR CIRCUIT SPECIFICATIONS

Tester Connection Condition Circuit Value
1 & Ground Ignition Switch In ON Position; Master Switch UP Or OFF No Voltage
1 & Ground Ignition Switch In ON Position; Master Switch DOWN Battery Voltage
1 & Ground Ignition Switch In ON Position; Master Switch UP Or OFF No Voltage
1 & Ground Ignition Switch In ON Position; Master Switch DOWN Battery Voltage
2 & Ground Ignition Switch In ON Position; Master Switch DOWN Or OFF No Voltage
2 & Ground Ignition Switch In ON Position; Master Switch UP Battery Voltage
2 & Ground Ignition Switch In ON Position; Master Switch DOWN Or OFF No Voltage
2 & Ground Ignition Switch In ON Position; Master Switch UP Battery Voltage
Fig 1: Identifying Power Window Motor Harness Connector Terminals
G99J51507Courtesy of Β© TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.