1998 Lexus GS 400FACTORY OEM SERVICE PROCEDURE

Shift Lock Solenoid

Disconnect shift lock solenoid connector (located at ignition switch). Using an ohmmeter, check resistance between solenoid connector terminal No. 3 and 4. See Fig 1. Resistance should be 12-17 ohms. While touching solenoid, connect battery positive lead to terminal No. 3 and negative battery lead to terminal No. 4. Solenoid operation should be felt. If resistance or operation is not as specified, replace solenoid and retest system operation.

Fig 1: Identifying Shift Lock Solenoid Terminals
G98A04729Courtesy of Β© TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.