1993 Lexus SC 400FACTORY OEM SERVICE PROCEDURE

Circuit Breaker Operation Test

  1. Unplug power window switch connector. Using fused jumper wire, connect battery voltage to switch connector terminal No. 5. Connect jumper wire from switch connector terminal No. 1 to ground. See Figure. Raise window to fully closed position. Continue to apply voltage. Ensure there is circuit breaker operation within 4-40 seconds.
  2. Reverse jumper jumper wires. Window should begin to go down within 60 seconds. Replace motor assembly if operation is not as specified.
Fig 1: Power Window Motor Connector Terminal ID
G93A83972Courtesy of Β© TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.