1990 Lexus LS 400FACTORY OEM SERVICE PROCEDURE

Inspection (Using An Ammeter With A Current-Measuring Probe)

  1. Remove the master switch with connector connected.
  2. Attach a current-measuring probe to terminal 9, of the wire harness. See Fig 1.
    Fig 1: Inspecting One Touch System With An Ammeter & Current-Measuring Probe
    G00147971Courtesy of Β© TOYOTA, LICENSE AGREEMENT TMS1002
  3. Turn ignition switch ON and set the power window switch in the down position.
  4. As the window goes down, check that the current flow is approximately 7 amperes.
  5. NOTE: The circuit breaker opens some 4-40 seconds after the window stops going down, so that check must be made before the circuit breaker operates.
  6. Check that the current increases approximately 14.5 amperes or more when the window stops going down.

If operation is not as specified, replace the master switch. See POWER WINDOW MASTER SWITCHΒ .

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.