2021 Jeep Grand Cherokee TrackhawkFACTORY OEM SERVICE PROCEDURE

Module, Power Liftgate Control (PLGM): Installation

GC0145737Courtesy of CHRYSLER GROUP, LLC
  1. Position the Power LiftGate Module (PLGM) (2) onto the left lower inner D-pillar (1).
  2. Engage the retainers at the lower end of the PLGM housing into the slots in the lower left inner D-pillar.
  3. Press the top of the PLGM housing against the lower left inner D-pillar, far enough for the retainers at the upper end of the PLGM housing to engage the clearance hole in the inner D-pillar.
  4. Connect the wiring harness connectors (3).
  5. Install the quarter trim panel to the lower left inner D-pillar. Refer to PANEL, QUARTER TRIM, INSTALLATION .
  6. Connect the battery negative cable.
NOTE:

If a new power liftgate system component is installed, or a mechanical liftgate adjustment is made, the PLGM must be calibrated (Refer to MODULE, POWER LIFTGATE CONTROL (PLGM)Β  ).

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.