2021 Jeep Cherokee TrailhawkFACTORY OEM SERVICE PROCEDURE

Module, Power Liftgate Control (PLGM): Installation

GC0187049Courtesy of CHRYSLER GROUP, LLC
  1. Position the Power Liftgate Module (PLGM) (3) in the vehicle so that the housing engages the body panel and secure the latch feature (2) of the PLGM.
  2. Connect the wire harness connectors (1) to the PLGM connector receptacles.
  3. Install the left rear quarter trim panel. Refer to PANEL, QUARTER TRIM, INSTALLATION .
  4. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
  5. Perform the STANDARD PROCEDURE - POWER LIFTGATE LEARN/RELEARN PROCEDURE. Refer to MODULE, POWER LIFTGATE CONTROL (PLGM), MODULE PROGRAMMINGΒ .
NOTE:

If this Electronic Control Unit (ECU) is being replaced with a new unit, a diagnostic scan tool MUST be used to determine if alignment of the PROXI configuration data into the new ECU is needed. If PROXI alignment is needed, follow the routine outlined in the diagnostic scan tool for PROXI Configuration Alignment under the Body Control Module (BCM) Miscellaneous Functions menu.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.