2021 Jeep Cherokee High Altitude, Automatic T/Case ControlFACTORY OEM SERVICE PROCEDURE

Solenoid, Variable Valve Timing: Installation

GC0181478Courtesy of CHRYSLER GROUP, LLC
  1. Install a NEWΒ  gasket (1).
    GC0181764Courtesy of CHRYSLER GROUP, LLC
  2. Install the Variable Valve Timing (VVT) solenoid (1) and tighten the bolts (2) to the proper torque specification. Refer to (TORQUE SPECIFICATIONSΒ ).
    GC0186994Courtesy of CHRYSLER GROUP, LLC
  3. If removed, install the right isolator to engine mount bracket bolt (2) and tighten to the proper torque specification. Refer to (TORQUE SPECIFICATIONSΒ ).
    GC0181153Courtesy of CHRYSLER GROUP, LLC
  4. Connect the VVT solenoid wire harness connector (1).
  5. Install the clean air hose and air cleaner body cover. Refer to INSTALLATION .
  6. Install the top engine cover. Refer to COVER, ENGINE, INSTALLATION .
  7. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.