2021 Jeep Cherokee Altitude, FWDFACTORY OEM SERVICE PROCEDURE

Cover(S), Engine Timing: Installation

WARNING: This page is about a different variant/trim than selected.
GC0144267Courtesy of CHRYSLER GROUP, LLC
  1. If removed, install the coolant outlet housing (1) to the timing cover with a new gasket using only the four bolts (2) shown in illustration. Tighten the bolts to the proper torque specification. Refer to (TORQUE SPECIFICATIONS ).
    GC0144266Courtesy of CHRYSLER GROUP, LLC
  2. Install the coolant outlet housing gasket (1) and the water pump gasket (2).
    GC0184003Courtesy of CHRYSLER GROUP, LLC
  3. After all residual sealant (2) has been removed, clean the oil pan and block mating surfaces with isopropyl alcohol in preparation for sealant application, then remove the shop towel (1) prior to timing cover installation. Refer to ENGINE GASKET SURFACE PREPARATION  .
    CAUTION:

    Engine assembly requires the use of a unique sealant that is compatible with engine oil. Using a sealant other than Mopar® Threebond Engine RTV Sealant may result in engine fluid leakage.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.