2013 Jeep Compass Limited, FWDFACTORY OEM SERVICE PROCEDURE

Continuously Variable Transmission (CVT) (Service Information): Differential: Assembly: Assembly

Fig 1: Press Bearings To Carrier
GC0085099Courtesy of CHRYSLER GROUP, LLC
  1. Use Installer C-3716-A and Handle (special tool #C-4171, Driver Handle, Universal) to install the bearings onto the carrier (both sides).
    Fig 2: Side Gears
    GC0085096Courtesy of CHRYSLER GROUP, LLC
  2. Install the side gears (2) and shims (3) onto the carrier.
    Fig 3: Pinion Gear Shim
    GC0085094Courtesy of CHRYSLER GROUP, LLC
  3. Place the pinion gears (3) onto the side gears with the correct shims (1).
  4. Roll into place.
    Fig 4: Pinion Shaft
    GC0085093Courtesy of CHRYSLER GROUP, LLC
  5. Install the pinion shaft (2).
    Fig 5: Pinion Shaft Roll Pin
    GC0085092Courtesy of CHRYSLER GROUP, LLC
  6. Use a new roll pin (3).
    Fig 6: Pin Punch At Roll Pin
    GC0085091Courtesy of CHRYSLER GROUP, LLC
  7. Install the roll pin (3) using a pin punch (1).
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.