2012 Jeep Wrangler Rubicon, Automatic TransFACTORY OEM SERVICE PROCEDURE

Solenoid, Variable Valve Timing: Removal: Left

Fig 1: Engine Cover
GC0153999Courtesy of CHRYSLER GROUP, LLC
  1. Disconnect and isolate the negative battery cable.
  2. Remove the engine cover (1).
    Fig 2: Throttle Body, Bolts & Connector
    GC0154042Courtesy of CHRYSLER GROUP, LLC
  3. Remove the throttle body (1). Refer to THROTTLE BODY, REMOVAL .
    Fig 3: Left Front Upper Intake Manifold Support Bracket & Fasteners
    GC0154016Courtesy of CHRYSLER GROUP, LLC
  4. Remove two nuts (2), two bolts (3) and reposition the left front upper intake manifold support bracket (1).
    Fig 4: Variable Valve Timing Solenoids, Connectors & Bolts
    GC0144208Courtesy of CHRYSLER GROUP, LLC
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.