2012 Jeep Grand Cherokee Laredo, AWDFACTORY OEM SERVICE PROCEDURE

Solenoid, Variable Valve Timing: Removal: Left

Fig 1: Air Inlet Hose, Air Temperature (IAT) Sensor Connector & Clamps
GC0145457Courtesy of CHRYSLER GROUP, LLC
  1. Disconnect and isolate the negative battery cable.
  2. Disconnect the electrical connector (2) from the Inlet Air Temperature (IAT) sensor.
  3. Loosen the clamp (1) at the throttle body.
  4. Loosen the clamp (4) at the air cleaner body.
  5. Remove the air inlet hose (3).
    Fig 2: VVT Solenoids, Connectors & Mounting Bolts (Left)
    GC0144208Courtesy of CHRYSLER GROUP, LLC
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.