2012 Jeep Grand Cherokee 2WD V8-5.7LFACTORY OEM SERVICE PROCEDURE

Blower Motor Power Module - Installation






INSTALLATION

NOTE: Automatic Temperature Control (ATC) shown. Manual Temperature Control (MTC) similar.

Factory service manual diagram




1. Position the blower motor power module (2) onto the HVAC housing (3).
2. Install the two screws (1) that secure the blower motor power module to the HVAC housing. Tighten the screws to 2 Nm (17 in. lbs.).

Factory service manual diagram




3. Connect the two wire harness connectors (1) to the blower motor power module (2).

Factory service manual diagram





NOTE: Illustration shown with instrument panel removed from view for clarity.

4. Connect the passenger side floor ducts (1) to the HVAC housing (2).
5. Install the passenger side instrument panel silencer.
6. Reconnect the negative battery cable.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.