2011 Jeep Compass Limited, FWD, StandardFACTORY OEM SERVICE PROCEDURE

Cooler, EGR: Installation: Installation

Fig 1: EGR Body & Gasket
GC0137787Courtesy of CHRYSLER LLC
  1. Clean all gasket mating surfaces.
  2. Install a new gasket (1) onto the EGR body (2).
    Fig 2: EGR Cooler & Bolts
    GC0137786Courtesy of CHRYSLER LLC
  3. Install EGR cooler. Tighten bolts (1) to 9 N.m (80 in. lbs.).
    Fig 3: Identifying EGR Cooler Bolt
    GC0137785Courtesy of CHRYSLER LLC
  4. Install the lower EGR cooler bolt (1). Tighten to 9 N.m (80 in. lbs.).
  5. Install the A/C connector mounting bracket.
    Fig 4: Identifying Upper EGR Cooler Bolt & Bracket
    GC0137784Courtesy of CHRYSLER LLC
  6. Install the upper EGR cooler bolt. Tighten bolt to 9 N.m (80 in. lbs.).
    Fig 5: Identifying Coolant Hoses & EGR Cooler
    GC0137783Courtesy of CHRYSLER LLC
  7. Connect coolant hoses (1) to the EGR cooler (2).
  8. Fill cooling system Refer to Standard ProcedureΒ .
  9. Install engine cover.
  10. Connect the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.