2009 Jeep Commander 2WD V8-5.7LFACTORY OEM SERVICE PROCEDURE

Cylinder Head Assembly

Cylinder Head Torque

Factory service manual diagram




Tighten cylinder head bolts 1 through 10 34 Nm (25 ft. lbs.)
Tighten cylinder head bolts 11 through 15 20 Nm (15 ft. lbs.)
Tighten cylinder head bolts 1 through 10 54 Nm (40 ft. lbs.)
Tighten cylinder head bolts 11 through 15 20 Nm (15 ft. lbs.)
Rotate cylinder head bolts 1 through 10 90°
Tighten cylinder head bolts 11 through 15 34 Nm (25 ft. lbs.)

Surface Variation - Head-to-Block

Cylinder Head For Out-of-flatness 0.0508 mm (0.002 in.)

Intake Manifold

Factory service manual diagram




Intake Manifold Bolts 12 Nm (105 in.lbs.)

Camshaft Sprocket

Camshaft Sprocket Bolt 122 Nm (90 ft.lbs.)

Exhaust Manifold

Factory service manual diagram



Left Side

Factory service manual diagram



Right Side

Exhaust Manifold-to-Cylinder Head 25 Nm (18 ft.lbs.)

Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.