1990 Jeep WagoneerFACTORY OEM SERVICE PROCEDURE

Resistance Test

  1. Disconnect wire harness connector from CTS. Test resistance of sensor with DVOM. Resistance should be less than 1000 ohms with engine warm. Replace sensor if not within range of resistance specified in chart. See TEMPERATURE-TO-RESISTANCE VALUESΒ  table.
  2. Test resistance of wire harness between ECU harness connector terminal No. 15 and sensor connector terminal, and terminal No. 32 to sensor connector terminal. See Figure and Figure . Repair wire harness if open circuit is indicated.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.