2014 Jaguar XK Base, 2D ConvertibleFACTORY OEM SERVICE PROCEDURE

Climate Control Module: Removal

WARNING: This page is about a different car, the 2011 Jaguar XKR, 2011 Jaguar XK, 2010 Jaguar XKR, and 2010 Jaguar XK. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove the cover and disconnect the battery ground cable. Refer to Specifications information.
  2. Remove the instrument panel. Refer to Instrument Panel information.
  3. Remove the A/C control module.
    • Remove the 4 Torx screws.
    • Disconnect the electrical connector.
    GJ0009597
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.