2004 Isuzu Axiom Base, RWDFACTORY OEM SERVICE PROCEDURE

General Assembly Notes

  1. The automatic transmission is composed of highly precision-finished parts, necessitating careful inspection before assembly because even a small nick could cause fluid leakage or affect performance.
  2. Before assembling new clutch discs and brake bands, soak them in automatic transmission fluid for at least thirty minutes.
  3. Apply automatic transmission fluid on the sliding or rotating surfaces of parts before assembly.
  4. Use petroleum jelly to keep small parts in their places.
  5. Do not use adhesive cements on gaskets and similar parts.
  6. When assembling the transmission, be sure to use new gaskets and O-rings.
  7. Dry all parts with compressed air - never use shop rags.
  8. Be sure to install the thrust bearings and races in the correct direction and position.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.