2003 Isuzu Rodeo 2WD L4-2.2LFACTORY OEM SERVICE PROCEDURE

Cylinder Head Assembly

Factory service manual diagram




Engine Main Specifications

Torque Specifications

Factory service manual diagram




Camshaft Bracket, Timing Gear Camshaft Side, Cylinder Head

Factory service manual diagram




Timing Gear Crankshaft (Center Bolt), Timing Belt Cover Front, Timing Belt Cover Rear, Timing Belt Tensioner, Camshaft Angle Sensor

Factory service manual diagram




Crankshaft Main Bearing, Oil Pan Support, Oil Pan, Balance Unit Assembly, Cone rod Cap, Oil Pump, Oil Strainer

Factory service manual diagram




Spark Plug, Throttle Body, EGR Valve Adaptor Assembly, Bypass Housing Assembly, Thermostat Assembly, Inlet Manifold Assembly, Exhaust Manifold Assembly, Heat Shield, Ignition Cable Cover

Factory service manual diagram




Engine Mount

Refer to procedure for cylinder head bolts tightening torque and sequence and cylinder head service specifications. Service and Repair
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.