2003 Isuzu Axiom Base, RWDFACTORY OEM SERVICE PROCEDURE

Measuring Insulation Resistance

  • Measure insulation resistance using a 500 volt megaohm meter.
  • Replace spark plugs if measured value is out of standard.

Insulation resistance:Β  50 M-ohm or more

Fig 1: Measuring Insulation Resistance
G02715010Courtesy of ISUZU MOTOR CO.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.