2002 Isuzu Trooper LS, RWDFACTORY OEM SERVICE PROCEDURE

Center Track Rod Assembly: Installation

  1. Install center track rod assembly.
  2. Install nut, cotter pin and relay lever, then tighten the nut to the specified torque, with just enough additional torque to align cotter pin holes. Install new cotter pin.

    Torque:Β  59 N.m (43 lb ft)

  3. Install nut, cotter pins and pitman arm, then tighten the nut to the specified torque, with just enough additional torque to align cotter pin holes. Install new cotter pin.

    Torque:Β  98 N.m (72 lb ft)

  4. Install nut and cotter pins, then tighten the nut to the specified torque, with just enough additional torque to align cotter pen holes. Install new cotter pin.

    Torque:Β  98 N.m (72 lb ft)

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.